Facility:
BAGEL BOY
Go back to search page
Violations for last two inspections (if any), click on each violation for a
description on how that violation impacts public health:
Inspection Date: 1/22/2026
Total Score:98
| 1 points: FLOORS WALLS CEILINGS |
| Tile floors in steam room noted in need of repair. Vent covers and ceiling in front food prep area noted in need of cleaning. Some ceiling tiles noted missing in production room. Floor by floor drain on production room noted in need of repairs. |
Inspection Date: 10/6/2025
Total Score:84
Critical Violations
| 3 points: INSECT RODENT ANIMAL CONTROL |
| The building containing the food service was noted with a structure which would allow the entrance of insects and/ or rodents. Door sweep of the downstairs production room entrance door noted damaged. |
Non-Critical Violations
| 2 points: CONTAMINATION DURING STORAGE |
| Food noted being stored in the production walk in cooler downstairs not covered. Dry bulk ingredient bins in the production room noted with lids open. some bulk dry ingredient bags noted left kept open after production was done and on the floor. Some food items noted being stored under missing or damaged ceiling tiles with evidence of water leaks. |
| 1 points: FLOORS WALLS CEILINGS |
| Floor tiles in the bagel boiling area in the kitchen noted in need of repairs. Some ceiling tiles noted missing and/or with water damage in the downstairs production area. Floors walls and ceiling in the kitchen and production ares downstairs noted in need of cleaning. |
| 1 points: LIGHTING |
| Some lights in the downstairs production area noted without shields. |