Facility: KEG WEST THE

Go back to search page

Violations for last two inspections (if any), click on each violation for a description on how that violation impacts public health:

Inspection Date: 3/31/2025
Total Score:94
2 points: FOOD CONTACT SURFACES - DESIGN
Formica prep counter in back used for food prep and reachin cooler door (interior chicken cooler) noted in need of repairs.
1 points: NON FOOD CONTACT SURFACES - DESIGN
Wooden shelves counter corners/edges (White island area) and prep table edges noted not in good repair.
1 points: NON FOOD CONTACT SURFACES - CLEAN
Exterior of frying equipment slow cooker exteriors reachin cooler/freezer exteriors and interiors plastic flour and sugar containers white buckets for chicken storarage exteriors and other equipment exteriors noted in need of cleaning.
1 points: FLOORS WALLS CEILINGS
Floors and walls in food prep area and dish washing area and ceiling tiles around vents noted in need of cleaning.
1 points: FLOORS WALLS CEILINGS
Floors in the areas subject to moisture walls around prep table and ceiling tiles with water damage noted needs repair and/or replacing.
1 points: PREMISES
Heating and Air conditioner units noted not cleaned frequently enough to prevent contamination of food food prep surfaces equipment or utensils in establishment.
Inspection Date: 10/4/2024
Total Score:91
Critical Violations
4 points: SANITIZATION OF EQUIP. AND UTENSILS
An inadequate amount of chlorine sanitizer was noted in the final rinse of the dish machine. None present and will use back dish machine until bar one is fixed.
Non-Critical Violations
2 points: FOOD CONTACT SURFACES - CLEAN
Microwave interiors and food scales not properly maintained.
1 points: NON FOOD CONTACT SURFACES - CLEAN
Exterior of frying equipment slow cooker exteriors reachin cooler/freezer exteriors and interiors plastic flour and sugar containers white buckets for chicken storarage exteriors and other equipment exteriors noted in need of cleaning.
1 points: FLOORS WALLS CEILINGS
Floors and walls in food prep area and dish washing area and ceiling tiles around vents noted in need of cleaning.
1 points: FLOORS WALLS CEILINGS
Floors in the areas subject to moisture walls around prep table and ceiling tiles with water damage noted needs repair and/or replacing.
1 points: NON FOOD CONTACT SURFACES - DESIGN
Wooden shelves counter corners/edges and prep table edges noted not in good repair.

back